Friday, 21 August 2020

2000 Porsche Boxster (986) F6-2.7L Page 50

Material damage to the connection to the brake pedal if the tightening torque used on the connecting pin is too great!

^ It is essential to observe the specified tightening torque on the connection thread bushing/pin!

1. Install new brake pushrod -9.1-. Tighten the threaded bushing -arrow- of the pin to 10 Nm (7.5 ft.lb.) (Please observe)!

2. Insert seal -7.2- (without lubricant) into the firewall. It is essential to ensure correct seating! Then insert (push in) the connection sleeve -7.1-

into the seal -7.2- using rubber sliding compound for example Capella or tyre mounting paste. Recheck that it is seated correctly and correct

if necessary!

3. Mount seal -7.3- and coat with Capella or tyre mounting paste.

4. Mount intermediate piece -11- (2 M8 nuts and hexagon socket head bolt). Tightening torque of the 2 M8 nuts = 23 Nm (17 ft.lb.)

5. Install battery.

6. Install new pushrod (if not already present) -12.1 - in place of -12-. When doing so, observe installation dimension X (138 mm).